Loadline is the system of record for the interconnect — not a chatbot over a folder of PDFs. A developer VP and a utility interconnection manager open the same file. Approve is stamped by a licensed PE, not the operator and not the model.
Loadline does not do power flow, queue gaming, or land acquisition — site control is a documented status, not work we perform.
Westfork 240 MW campus
Harbor Point Data · Fort Worth, TX · ERCOT
2 of 10 complete · Queue through COD
- 01
Queue
Complete - 02
Screening
Complete - 03
SIS
2027-06-30 - 04
Facilities study
— - 05
IA
— - 06
Site control documented
— - 07
Air / env. permits
— - 08
Utility design
— - 09
Construction
— - 10
COD
—
Status checkbox: evidence that site control exists. Loadline does not acquire land.
Permit conditions
AIR PERMIT NO. 18421 · extract
240 MW continuous demand
Needs PE reviewSection 4.2 · no deadline · WESTFORK SAMPLE
The facility shall not exceed a continuous electrical demand of 240 MW without prior written approval of the commission.
Status · needs PE review · approve locked
Markdown export
Export audit pack# SAMPLE · Westfork 240 MW audit pack ERCOT · 240 MW · COD 2028-06-30 - [Blocked] SIS · 2027-06-30 - [PE review] 240 MW demand - [PE review] Studies by 2027-06-30