The interconnect, on one path.

One project file from intake through COD. Conditions get PE review. The audit pack is what you hand the utility.

For EPCs and owner’s engineers moving large loads in ERCOT and PJM.

How it works

PE never skipped

  1. Intake

    Open the MW load. Queue position sits on one file.

  2. Screening

    Completeness and feasibility before studies start.

  3. Studies

    SIS and facilities. A slip is visible on the path.

  4. Permits

    Conditions extract. A licensed PE must approve.

  5. COD

    Construction through commercial operation. Export the audit pack.

Loadline is the system of record for the interconnect — not a chatbot over a folder of PDFs. A developer VP and a utility interconnection manager open the same file. Approve is stamped by a licensed PE, not the operator and not the model.

Loadline does not do power flow, queue gaming, or land acquisition — site control is a documented status, not work we perform.

SAMPLE / Westfork sampleMILESTONE

Westfork 240 MW campus

Harbor Point Data · Fort Worth, TX · ERCOT

2 of 10 complete · Queue through COD

  1. 01

    Queue

    Complete
  2. 02

    Screening

    Complete
  3. 03

    SIS

    2027-06-30
  4. 04

    Facilities study

  5. 05

    IA

  6. 06

    Site control documented

  7. 07

    Air / env. permits

  8. 08

    Utility design

  9. 09

    Construction

  10. 10

    COD

Status checkbox: evidence that site control exists. Loadline does not acquire land.

SAMPLE / Westfork samplePE REVIEW

Permit conditions

AIR PERMIT NO. 18421 · extract

240 MW continuous demand

Needs PE review

Section 4.2 · no deadline · WESTFORK SAMPLE

The facility shall not exceed a continuous electrical demand of 240 MW without prior written approval of the commission.

Status · needs PE review · approve locked

Studies complete no later than June 30, 2027Needs PE review
SAMPLE / Westfork sampleAUDIT PACK

Markdown export

Export audit pack
# SAMPLE · Westfork 240 MW audit pack
ERCOT · 240 MW · COD 2028-06-30

- [Blocked] SIS · 2027-06-30
- [PE review] 240 MW demand
- [PE review] Studies by 2027-06-30